A case history study on causation of the landslide in Santa Clara, California, USA

来源 :Journal of Rock Mechanics and Geotechnical Engineering | 被引量 : 0次 | 上传用户:chenpeng12333
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
This paper presents a case history study on the geologic investigation and numerical modeling of a reactivated landslide in the County of Santa Clara,California to identify the failure mechanism.The landslide occurred on an approximately 18.3-m high,north-facing slope during March 2011.The landslide measured about 33.5 m in width and about 51.8 m in length.Along the toe of the slope,a residential structure with a swimming pool was built on a cut and fi ll pad and there are several other structures present along the western side of the pad.The landslide occurred immediately to the south of the residential building and moved northward between the County Road A and the house’s side yard.The movement of the landslide resulted in damaging the west-bound traf fi c lane of County Road A and encroached onto the paved driveway for the residential property.An investigation was performed to identify the failure mechanism of the landslide to conclude whether Road A re-alignment by the County or prominent cutting performed along the lower portion of the slope by the homeowner during 2000through 2004 contributed to the reactivation of the old landslide deposit.The investigation included site reconnaissance,reviewing available published geologic information,reviewing site-speci fi c geologic and geotechnical data developed by other consultants,and performing numerical modeling.The outcomes of the investigation indicate that the primary causation for the reactivation and failure of the subject preexisting landslide is the prominent cutting performed along the lower portion of the slope during 2000through 2004 and water tank cut bench.The Road A re-alignment did not contribute to the reactivation of the old landslide deposit. This paper presents a case history study on the geologic investigation and numerical modeling of a reactivated landslide in the County of Santa Clara, California to identify the failure mechanism. Landslide occurred on an approximately 18.3-m high, north-facing slope during March 2011 The landslide measured about 33.5 m in width and about 51.8 m in length. Along the toe of the slope, a residential structure with a swimming pool was built on a cut and fi ll pad and there are several other structures present along the western side of the pad. landslide occurred immediately to the south of the residential building and moved northward between the County Road A and the house’s side yard. The movement of the landslide resulted in damaging the west-bound traf fi c lane of County Road A and encroached onto the paved driveway for the residential property. An investigation was performed to identify the failure mechanism of the landslide to conclude whether Road A re-alignment by the County or prominent cutting performed along the lower portion of the slope by the homeowner during 2000through 2004 the reactivation of the old landslide deposit.The investigation included site reconnaissance, reviewing available published published geologic information, reviewing site-speci fi c geologic and geotechnical data developed by other consultants, and performing numerical modeling. The outcomes of the investigation that that the primary causation for the reactivation and failure of the subject preexisting landslide is the prominent cutting performed along the lower portion of the slope during 2000through 2004 and water tank cut bench. Road A re-alignment did not contribute to the reactivation of the old landslide deposit.
其他文献
期刊
In order to reduce the risk associated with water seepage in an underground rock cavern project in Singapore,a reliable hydro-geological model should be establi
电力电缆一般是用于电力系统传送和分配电能的线路的,基本上是埋设于土壤、敷设于建筑空间、隧道、沟道等之中,受到自然气候、温度、环境等的影响比较大,具有传输性能稳定、安全
摘 要:推进资产管理和预算管理相结合,可以从根本上解决资产管理中存在的问题,提高资产使用效益,也可以推动部门预算改革的不断深化,提高财政预算资金的使用效率,本文从建立资产管理与预算管理相结合工作机制的意义入手,借鉴先进地区的做法,提出了推进建立资产管理与预算管理相结合工作机制的几点建议。  关键词:资产管理;预算管理;机制  中图分类号:F123.7 文献标识码:A doi:10.3969/j.i
随着我国经济的发展和社会的进步,我国的建筑行业也在不断的发展,随之产生了一系列的建筑质量问题,针对于此,需要进行相关的处理,从而不断提高对于建筑质量的检测工作.想要不
为探究吕家坨井田地质构造格局,根据钻孔勘探资料,采用分形理论和趋势面分析方法,研究了井田7
期刊
灾难发生前往往会潜藏着一些隐患。实际上,多数大规模的失败都是源于一连串的小错误和小隐患,而不是一个单独的根本性原因。这些小隐患零散的分布最终酿成了大灾难
本研究采集宿州某矿区土壤及周围农田土壤,测定土壤的理化性质,结合平板培养和Biolog微生物检测系统培养技术,分析土壤可培养土壤微生物菌群数、AWCD值、碳源代谢强度、微生
新课程倡导的学习方式是自主探索,合作交流与动手实践。在数学教学中让学生充分参加实践活动,鼓励学生自主质疑,去发现问题,大胆发问。创设质疑情境,让学生由过去的机械接受
摘 要:2009年以来,欧洲部分国家相继爆发主权债务危机。2013年,惠誉、穆迪相继下调中国的信用评级,一时间,中国国家债务问题备受关注。本文首先从国家债务的概念入手,分类统计并分析中国国家债务水平,最后针对问题,提出政策建议。  关键词:国家债务;水平;模式;对策建议  中图分类号:F812.5 文献标识码:A doi:10.3969/j.issn.1672-3309(x).2013.06.26