支墩坝的优化设计法

来源 :广西水利水电科技 | 被引量 : 0次 | 上传用户:seasonlao
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
作者改进的支墩坝优化设计法能比惯用的设计方法节省混凝土量近12%,其程序已应用于伊泰普和罗賽塔斯坝,证明它是有效的且富有经济潜力。当大头坝首次出现,它与古典的重力坝相比,工程量更为合理,美国工程师 F.诺赛力在1927~1928年建造高36米的唐·马尔坦坝取得成功。促进欧洲专家们如 A·斯丘盖和 C·马尔西洛兴建了同类型坝,首批这类坝有: The authors’ improved design method of supporting pier and dam can save nearly 12% of the concrete volume compared with the conventional design method. The program has been applied to Itaipu and Rosetas dam to prove that it is effective and has economic potential. When the dam appeared for the first time, its work volume was more reasonable compared to the classical gravity dam, and the success of Don Martan Dam, constructed by American engineer F. Norseli from 1927 to 1928, was 36 meters high. Promote the European experts such as A. Schuque and C. Marcelo built the same type of dam, the first such dam are:
其他文献
多水库水电系统每周的运行策略最优化是一个随机非线性规划问题。对于小型系统,这一问题可用动态规划求解;而对于大型系统,目前还没有直接求解的方法,因而必须求助于数学变换
幼年类风湿性关节炎(JRA)是小儿常见的风湿病之一。由于其以反复发作的关节炎症为特征,因此应尽早采用综合疗法,并坚持长期持久的药物治疗。本文重点讨论JRA药物治疗的进展及临床应用。
The self-assemblies of 4-hexadecyloxybenzoic acid and 3,4,5-trihexadecyloxybenzoic acid have been studied by using scanning tunneling microscopy (STM). The well
渠村分洪闸位于河南省濮阳县渠村青庄险工地段,于一九七八年五月建成。全长五十六孔共七百六十五米,分洪能力为一万秒立米。它是目前黄河上一座最大的分洪洞,在防御黄河下游
土工试验仪器委员会将于1983年3月举行土的压缩试验仪器观摩会。会议期间将展出各种土的压缩试验仪器,并将对土的压缩试验等有关问题进行讨论。会议还将邀请有关专家作学术
In the reactions of α cyanocinnamonitrile or β cyano β carbo~thoxy styrene with 5,5 dimethyl 1,3 cyclohexanedione in the presence of ammonium
期刊
Four novel mononuclear ruthenium(II) complexes [Ru-(dmb) 2L] 2+ [dmb=4,4′-dimethyl-2,2′-bipyridine, L=imid-azo-[4,5-f]phenanthroline (IP), 2-phenylimida
期刊
技术目标1、改进影响估算流域和河流流域管理体系在径流的质量和数量方面的方法.2、发展水的储藏、改进增大水面和地下水供应的方法.3、为治水和测量改进发展所需要的新型的
天津市微型汽车厂是根据国家对轿车工业的总体布局,依靠技术进步和管理进步,走技术引进和挖潜改造之路发展起来的。前身是天津市汽车制造厂(南厂区),于1988年1月1日分立,始
微型水电是指容量在100千瓦以下的水电。本文通过对已建成投产的电站的分析,对美国微型水电的经济效益、存在问题以及发展趋势进行了探讨。微型水电对国家能源生产虽不可能