探讨做好工程招投标阶段造价管理的有效措施

来源 :建材与装饰 | 被引量 : 0次 | 上传用户:zhiyuanboxue
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
近几年来,随着我国社会主义经济的不断发展,我国建筑工程建设进程也不断推进,其中,工程招投标阶段的造价管理作为建筑工程管理的核心部分,不仅影响着建筑工程的整体质量,也与我国国民经济的增长息息相关。本文通过分析工程招投标阶段的造价控制管理的重要意义,进而针对我国现阶段工程招投标造价管理中出现的具体问题进行了详细研究,从而提出了提高其造价管理工作的有效措施,以期望提供相关参考。 In recent years, with the continuous development of socialist economy in our country, the process of building construction in our country has been continuously promoted. Among them, the cost management in bidding and bidding stage as the core part of construction management not only affects the overall quality of construction projects, It is closely related to the growth of our national economy. This paper analyzes the importance of cost control management in bidding and bidding stage and then studies the specific problems in bidding and bidding cost management in our country at this stage in detail and puts forward some effective measures to improve its cost management in the hope of providing Related reference.
其他文献
单位:元/公斤粳米玉米大豆豆油猪肉牛肉羊肉活鸡鸡蛋鲤鱼草鱼6609,8030 2090巧70 00204月片,、︸月铸,、︸乙.﹃、︺5、101 1.60n CUn曰nnC八n曰︸、︸ :﹄.︸气︺‘J,1.,了,.100 50 00 5000,j
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
摘要:施工现场管理是对建筑工程项目的综合性管理,在管理的过程中,对项目工程的施工安全、工程质量、物料管理以及环境保护进行有效而且及时的管理。通过有效的施工现场建设,能够对建筑工程现场进行有效的管理,并且保证工程的施工质量。本文笔者对提高建筑施工现场的管理水平的有效措施进行了探讨,希望对相关从业人员具有借鉴意义。  关键词:建筑,施工,现场,管理  中图分类号:TU71 文献标识码: A  前言:在
期刊
为降低能耗,采用多效降膜蒸发工艺代替单效强制循环蒸发工艺对溶剂萃取法湿法磷酸净化装置进行改造.分析改造前后工艺流程,介绍改造后主要设备选型及参数控制,并阐述该工艺方
期刊