前言清江流域规划要点工作从一九五七年七月斯米尔诺夫及佛明专家查勘起,全部内外业包括查勘、地形测量、地质勘探、资料收集、报告编写等工作前后共历时一年,至一九五八年七月提出了清江流域规划要点报告。清江流域规划要点报告大体探明了清江流域的基本特征,肯定了清江干流梯级开发的方向和第一期工程,为进一步工作打下了良好基础。但是,流规要点阶段尚遗留了一些较为重要的问题没有最后解决,这些问题还须在要点阶段结束后继续进行工作,与有关单位共同协商,求得较妥善的解决。为了交流经验,使支流特别是山区河流划规工作得到进一步提高,特将规划要点简要介绍于后。
Preface Qingjiang River Basin Planning Essentials Work From July 1957 Smirnov and Fomin expert survey, all the domestic and foreign industry, including survey, topographic survey, geological exploration, data collection, preparation of reports and other work before and after a total of one year, By July 1958, the report on planning points for the Qing River Basin was put forward. The Qingjiang River Basin Planning Essentials Report basically ascertains the basic features of the Qingjiang River Basin, confirms the direction and the first phase of the cascade development of the Qingjiang River, and lays a good foundation for further work. However, there are still some important issues left over at the regulation stage of the flow but not the last ones. These problems must continue after the conclusion of the essential stage and consult with the relevant units to find a better solution. In order to exchange experiences and make the tributaries, especially mountain river planning work to be further improved, especially the planning points briefly introduced.