设计管理是整个油田工程项目管理的重要组成部分,设计所产生的文件是油田物资采购、施工和投产的主要依据,因此,设计工作对工程项目的费用、进度和质量控制起着决定性的作用。全面论述东方1-1气田基本设计项目管理的做法,包括招标文件的编制、招标与评标、工作暂停、设计管理、方案优化、工作变更、进度控制、费用控制以及经验教训。
Design management is an important part of the project management of the entire oil field. The documents produced by the design are the main basis for the procurement, construction and commissioning of oilfield materials. Therefore, the design work plays a decisive role in the cost, schedule and quality control of the project. This paper comprehensively discusses the management of the basic design project of East 1-1 Gas Field, including preparation of bidding documents, bidding and bid evaluation, work suspension, design management, program optimization, job change, schedule control, cost control and experience and lessons.