在批林批孔运动推动下,我局机械施工公司广大职工,高举《鞍钢宪法》的旗帜,坚持“自力更生”的无产阶级革命精神,奋战四个月,胜利的完成了一台旧电吊的改造。改造后的吊车,起重量由15吨,增大到25吨,起重高度由18米增加到34米,性能良好,满足了施工任务的需要,填补了我局高重构件吊装的空白,为进一步发挥现有吊装机械的潜力提供了经验。一、路线对头,眼明心亮一九七三年我们承担了××电厂的施工任务,该工程的主厂房为全装配式结构,构件重22吨,起重高度34米,就我局现有的起重设备,是拿不下这个工程的。
Driven by the approval of the Lin Piao and Confucius Movement, the staff of the mechanical construction company of the Bureau held high the banner of the “Anshan Iron and Steel Constitution” and adhered to the “self-reliance” proletarian revolutionary spirit. They fought for four months and successfully completed an old electric crane. Transformation. After the transformation of the crane, the lifting capacity increased from 15 tons to 25 tons, and the lifting height increased from 18 meters to 34 meters. The performance was good and met the needs of the construction task. It filled up the blank of high-heavy component lifting of the Bureau for further improvement. The use of the potential of existing lifting machinery provides experience. First, the course is on the right track, and the eyes are bright. In 1973, we undertook the construction of the XX power plant. The main plant of the project was a fully assembled structure with a weight of 22 tons and a lifting height of 34 meters. Some lifting equipment can not take this project.