论文部分内容阅读
根据柔度法原理及地锚式斜拉渡槽的特点,建立变位协调方程,用以分析地锚式双塔悬浮体系斜拉输水结构的静力与变位。
According to the principle of flexibility method and the characteristics of ground anchored cable stayed aqueduct, the displacement coordination equation is established to analyze the static and displacement of the cable-stayed aqueduct in the anchored twin tower suspension system.