论文部分内容阅读
泵站施工中的意外情况处理李家鳌,王圣公,丁全录,杨文义1概况上海市地铁1号线全长16.1km,共设13个车站,7个泵站。泵站位于两车站之间的最低水平,以便把水集中后排出地面或作为消防用水。上海地层在地质上属第四纪沉积岩,泵站工程所在位置大部处于饱和含...
Accidental Handling in Pumping Station Construction Li Jiaao, Wang Shenggong, Ding Quanlu, Yang Wenyi 1 Overview Shanghai Metro Line 1 is 16.1km in length with a total of 13 stations and 7 pumping stations. The pumping station is located at the lowest level between the two stations in order to concentrate the water and discharge it to the ground or as fire fighting water. Shanghai strata in the geological Quaternary sedimentary rock, pumping station where most of the engineering is in ...