论文部分内容阅读
萨尔-切希麦赫斑岩铜矿床,是世界上最大的开采矿山之一,每昼夜生产4万吨铜-钼矿石(相当于1480吨34%的铜精矿和10吨54%的钼精矿).1978年下半年计划建一座年产14.5万吨粗铜的冶炼厂,以后还要建一座年产17.1万吨铜的精炼厂.矿床的可靠和估计矿量为4.27亿吨(地表以下360米),铜平均品位1.13%,钼0.03%,铜的边界品位0.4%.其中,9320万吨为氧化矿(Cu-1.996%),3.35亿吨为原生矿(Cu-0.895%).目前正在进行的钻探工作,在深度600米以上探明的总矿石量为8亿吨,平均含铜1%.该矿床位于扎格罗斯山脉中部,产于近南北走向的火山-侵入岩带范围内.该带由从土耳其延续到伊朗俾路支
The Sal-Che Sheme porphyry copper deposit, one of the largest mines in the world, produces 40,000 tonnes of copper-molybdenum ore day and night (equivalent to 1480 tonnes of 34% copper concentrate and 10 tonnes of 54% Molybdenum concentrate.) In the second half of 1978, a smelter with an annual output of 145,000 tons of blister copper is planned to be built and a refining plant with an annual output of 171,000 tons of copper will be built in the future. The reliable and estimated amount of ore deposits is 427 million tons The average grade of copper is 1.13%, the molybdenum is 0.03% and the boundary grade of copper is 0.4%, of which 93.2 million tons is Cu-1.996% and 335 million tons is Cu-0.895% Ongoing drilling is now at a total of 800 million tons of ore, about 1% copper, at a depth of 600 meters, and is located in the central part of the Zagros Mountains, producing volcanic-intrusive rocks near the north and south Within the band from the continuation of Turkey to Iran Baluchistan