桥头发电厂四期输煤系统建筑4 个圆筒仓(15m ×高24m ,存煤量4000t/个) 。1984 年投产以来,主要存在仓内部结篷煤、粘煤严重,筒仓运行达不到设计出力,影响到系统的储煤和配煤工作的正常化,对发电厂锅炉的经济运行造成了不良影响。筒仓粘、篷煤的主要原因是:落煤斗内壁面倾斜度不够;壁面结构及材料不佳;煤种水份含量大。对此,我厂经多方调研,选用新型材料高分子聚乙烯板材( 简称聚高板) ,对筒仓内部结构进行土建改造后加衬聚高板。改造后,筒仓运行达到设计出力,保证了圆筒仓的储煤及配煤工作的顺利实施。
The Qiaotou Power Plant Phase IV Coal Handling System is built with 4 cylinders (15m × 24m high, with a coal storage capacity of 4000t/a). Since it was put into production in 1984, there were mainly internal coal kerfs and sticky coal in the warehouse. The operation of the silo failed to reach the design output, which affected the normalization of the system’s coal storage and coal blending operations, and caused poor economic operation of the power plant boilers. influences. The main reasons for silo sticking and canopy coal are: The inclination of the inner wall surface of the coal falling bucket is not enough; the structure and material of the wall surface are not good; the moisture content of the coal is large. In this regard, after many investigations, our factory selected a new type of material, high-molecular polyethylene sheet (abbreviated as poly-high sheet), and lining poly-high sheets after the civil reconstruction of the internal structure of the silo. After the transformation, the silo operation reached the design effort and ensured the smooth implementation of the coal storage and coal blending operations of the silo.