论文部分内容阅读
结合北京地铁郭公庄车站工程实例,就施工过程中的质量控制进行了分析,通过试验检测控制施工质量,使锚索施工达到最佳效果。
Combined with the project of Guo Gongzhuang station in Beijing Subway, the quality control in the construction process was analyzed, and the construction quality was controlled by testing to achieve the best effect of anchor cable construction.