论文部分内容阅读
万安水利枢纽位于江西赣江中游,控制流城面积36900平方公里,地处峡谷出口,万安县城以上1.5公里。坝址年平均迳流量299亿立米,水量充沛,地形地质条件优越,地理位置适中,有“江西三峡”之称.早在1958年长办提出《赣江流域综合利用规划报告》和1959年江西省水利厅提出的《江西省水利电力综合规划报告》中,均选定为赣江干流第一期开发工程,它在赣江水利资源开发利用中占有重要地位。工程曾于1960年开工兴建,1962年停建,为了加速四个现代化建设,江西省曾一再报请中央复工兴建,1978年经国家计委批准复工。属国家“六五”期间在建的重大建设项目之一。
Wan’an Water Control Project is located in the middle reaches of the Ganjiang River in Jiangxi Province, the control flow area of 36,900 square kilometers, located at the exit of the Canyon, Wanan 1.5 kilometers above the city. The annual average flow of dam site was 29.9 billion cubic meters with abundant water, favorable topographic and geological conditions and moderate geographical position, as the “Three Gorges of Jiangxi Province.” Back in 1958, the Chief Executive proposed “Planning Report on Comprehensive Utilization of the Ganjiang River Basin” and 1959 Jiangxi The provincial water conservancy department proposed “Jiangxi province water conservancy and electricity comprehensive planning report”, are selected for the first phase Ganjiang River development project, which in the development and utilization of Ganjiang water resources play an important role. The project was started construction in 1960 and was suspended in 1962. In order to speed up the four modernizations, Jiangxi Province has repeatedly submitted to the Central Government for resuming construction and in 1978, it was approved by the State Development Planning Commission to resume its work. It is one of the major construction projects under construction during the “Sixth Five-Year Plan” of the country.