论文部分内容阅读
壁式桩是中国建筑工程公司在阿尔及利亚大清真寺宣礼塔总承包项目的基础工程,也是整个项目一个重要的分项工程,从2012年9月到2013年11月,总历时约13个半月。壁式桩因刚度高、稳定性好、经济性强,越来越为超高层建筑所采用,又因施工难度大,在非洲大陆上鲜有先例。宣礼塔壁式桩工程由试验桩和正式桩两部分构成,专业分包是意大利TREVI公司,无论是桩型还是国际分包管理,对中建阿尔及利亚区域团队来说都极为陌生。同时,壁式桩工程又是一个集合了技术、合约、采购、施工等多要素的综合性系统,且与国内项目
Wall piles are the foundation works of China State Construction Engineering Corporation’s Grand Prix General Contracting Project in Grand Mosque in Algeria and also an important sub-project of the entire project. From September 2012 to November 2013, the wall piles lasted for about 13 and a half months. Due to high rigidity, good stability and high economic efficiency, wall piles are used more and more for super high-rise buildings. Due to the difficulty of construction, there are few precedents in the continent. The minaret wall piles project consists of two parts: test piles and formal piles. Professional subcontracting is TREVI Company in Italy. Whether it is pile type or international subcontracting management, it is extremely unfamiliar to the CCCC Algerian regional team. At the same time, the wall pile project is a comprehensive system that integrates technology, contract, procurement, construction and other elements, and with domestic projects