论文部分内容阅读
简要介绍了对程潮铁矿尾矿进行回收利用的可行性研究,并以此制订出了工艺流程、工艺参数和最佳配比,为低硅铁尾矿研制加气混凝土开辟了一条新途径。
This paper briefly introduced the feasibility study on the recovery and utilization of the tailings in Chengchao Iron Mine and worked out the technological process, process parameters and optimal ratio to open up a new way for the development of aerated concrete in the low ferric tailings.