大量砼箱梁工程健康指标调查资料显示,我国预应力砼连续箱梁桥工程普遍存在裂缝问题,其中裂缝的形式以纵向裂缝为甚。移动支架逐孔现浇施工法是一种具有工程造价低、工程周期性显著、施工作业标准化强等特征的施工方法,其目前已被广泛应用到中等跨径长桥施工领域。由于移动支架施工法的特殊属性,其极易使箱梁横隔板间距、底板砼横向拉应力、箱梁底板横向配筋三者之间产生矛盾,进而引起预应力砼箱梁节段张拉锚固面底板产生纵向裂缝。
A large number of concrete box girder project health indicators survey data show that China’s prestressed concrete continuous box girder bridge project widespread cracks, of which the form of cracks to longitudinal cracks. Hole-in-place construction method for mobile scaffolding is a kind of construction method with low engineering cost, significant engineering cyclicality and strong standardization of construction operation. It has been widely applied to the construction of medium-span long bridge. Due to the special properties of the mobile scaffold construction method, it is very easy to make the spacing between the diaphragm of the box girder, the lateral tensile stress of the floor concrete, and the horizontal reinforcement of the floor of the box girder generate contradictions, which in turn leads to the tensioning of the prestressed concrete box girder sections Longitudinal cracks in the anchor plane floor.