随着经济的快速发展,国家逐步重视基础设施建设,公路工程项目投资额度逐步增加:1公路建设项目总投资增加;2单位里程的造价增加。同时公路项目的复杂程度也加大。信息的不对称、内外环境交错、工程变更、合同变更等均对公路工程施工阶段的造价控制造成影响,需采取有效措施管理和控制影响施工阶段造价的各种因素,控制施工阶段的成本投入,提高项目效率。本文主要是从公路工程施工阶段的造价管理的相关内容进行了阐述。
With the rapid economic development, the state gradually attaches importance to infrastructure construction. The investment quota of highway engineering projects gradually increases: 1 The total investment in road construction projects increases; and the cost per unit mileage increases. At the same time the complexity of highway projects also increased. Asymmetric information, internal and external environment staggered, engineering changes, changes in the contract and so on all affect the cost control of highway engineering construction phase, we need to take effective measures to manage and control the various factors that affect the construction phase of the cost, control the cost of construction phase inputs, Improve project efficiency. This article mainly elaborates from the related content of cost management during the highway construction phase.