叙述了利用几种计算机程序对铁矿资源的再评估、利用新工艺开发工艺流程、新的再开采计划的准备和新厂厂址的确定。根据各种评估结果 ,哈森谢列毕 (Hasancelebi)矿床的地质储量确定为 32亿t和新厂要开发的东矿体的可采储量为 94 0 0万t,因此 ,这个新处理厂作为土耳其的一个采矿基地占有重要位置。已建立起年产铁矿石原矿 75 0万t和含铁 6 9% (含Fe3 O483% )的 15 0万t球团矿的矿山开采基地 ,矿山服务期限可达 14年。这项工程的总投资约为 1 4 5亿美元 ,可提供 183个就业岗位。研究哈森谢列毕矿床的结果表明 ,这项工程投资具有可信的价值 ,然而 ,必须进行最终的可行性研究和评估。
Describes the reassessment of iron ore resources using several computer programs, the development of process flows using new processes, the preparation of new re-mining plans and the determination of the site of a new plant. Based on various assessment results, the geological reserve of the Hassenlebi deposit is determined to be 3.2 billion tons and the recoverable reserves of the East Mine to be developed at the new plant are 94.0 million tons. Therefore, this new treatment plant is regarded as one of Turkey’s Mining base occupies an important position. The mine has set up a mining base with an annual output of 7.5 million tons of iron ore ores and 1.5 million tons of pellets containing 69% (Fe3 O483%) of iron ore. The service period of the mines can be up to 14 years. The total investment of this project is about 145 billion U.S. dollars, providing 183 jobs. The study of the Hassen-Liebherr deposit shows that the project investment is credible, however, a final feasibility study and assessment must be conducted.