天津新港地区高桩码头,目前主要是宽桩台结构,这是与现有施工机具和设备相适应的,但它有一些缺点,需要改进。 新港地区近年来所建的深水高桩码头,高桩台加后板桩档土墙的结构型式(图1),需使板桩有足够的深度,以保持码头的整体稳定。其中后方桩台为预应力简支梁板结构,桩距3.5×7米。前方桩台,桩的排距为
The high-pile wharf in Tianjin’s Xingang area is currently mainly a wide-tailed platform structure, which is compatible with the existing construction machinery and equipment. However, it has some shortcomings and needs improvement. In recent years, the new harbor area has been constructed with deep-water high-pile wharfs and high-pile platforms plus post-pile retaining wall structure (Figure 1). The sheet piles should be of sufficient depth to maintain the overall stability of the wharf. Among them, the back piles are prestressed simply supported beam structures with a pile spacing of 3.5 × 7 meters. In front of pile table, pile spacing is