论文部分内容阅读
在推广双机液压凿岩台车和斗式转载列车配套使用的平巷掘进机械化作业线的过程中,云锡公司马拉格矿技术革新组,为了解决台车与其它车辆在单一轨道上错车的问题,设计制造了平板调车器(风附图)。每当凿岩工序结束,需要将台车退出工作面时,可先将平板调车器放在离工作面20~50米较宽的巷道处,斜轨框座平放在轨道上,斜轨与轨道吻合。将台车沿斜轨推上斜轨框座,再推向右边
In the process of popularizing the mechanized drifting tunneling operation which is used in the dual-hydraulic drilling rigs and the bucket-loading trains, the technology innovation group of Malange Mine of Yunxi Company, in order to solve the problem that the trolley and other vehicles are on a single track Problem, design and manufacture of flat shunt (wind attached map). Whenever the drilling process is completed, the need to withdraw the trolley when the work surface, the first shunting machine can be placed 20 to 50 meters away from the face of a wide roadway, ramp box seat flat on the track, ramp And track coincide. Push the trolley along the ramp onto the ramp frame and push it to the right