布赫塔尔明斯克水电站斜流式水轮机试验机组的基本参数、结构说明及其真机能量特性见Л.Г.Смоляров和А.А.Евдокимов的文章。本文绘出了该斜流式水轮机主要零件应力状态下的研究结果。测量方法在下列主要零件上测定应力:叶片和转轮体、水轮机顶盖。同时测定扭矩,轴向水推力、水轮机顶盖挠度并摄录了机组振动特性。除主要数据外,还记录了确定调速机构位置的辅助数据,例如:水轮机转速、转轮叶片转角、导叶接力器活塞行程和时间。测量在下列工况下进行:
Bukhtar Minsk Hydropower Station bevel turbine test unit of the basic parameters, structure and real machine energy characteristics see Л.Г. Смоляров and А.А.Евдокимов article. This paper plots the results of the research on the stress state of the main part of the diagonal flow turbine. Measurement methods The following key components in the determination of stress: blades and wheel body, turbine roof. Simultaneously determine the torque, axial water thrust, turbine roof deflection and video recording unit vibration characteristics. In addition to the main data, auxiliary data identifying the position of the governor mechanism are recorded, such as turbine speed, runner blade angle, guide vane piston travel and time. The measurement is carried out under the following conditions: