1事故简要经过2007年5月20日1 1时30分,甘肃省有年金龙建筑公司第五项目部在张掖市一中学教学综合楼建筑施工时,1台QTZ-25型塔式起重机(安装高度10节25m,臂长30m),坐落在楼东边将楼西边地面的1430kg钢筋吊起、变幅为29.3mm向南回转,回转时发生倒塌事故。塔式起重机在第5节标准节根部处断裂,致使塔机向前倾覆塌垮,坠落的起重臂将3层的1名木工当场砸死,1名在地面的工人和塔机司机受伤。
1 Accident Brief After 1:30 on May 20, 2007, Gansu Province Jinlonglong Construction Company Fifth Project Department in Zhangye City, a middle school teaching building construction, a QTZ-25 tower crane (installation Height of 10 knots 25m, arm length 30m), located on the east side of the floor floor of the building on the west side of the 1430kg steel hoist, amplitude 29.3mm revolve south, collapsed accident occurred during rotation. The tower crane fractured at the root of Section 5 Standard Section, causing the tower crane to collapse and collapse. The falling boom smashed a 3rd-floor woodworker on the spot and a ground worker and tower crane driver were injured.