论文部分内容阅读
在分析水电站厂内经济运行的各种数学模型的基础上,考虑了主结线运行方式约束对经济运行的影响,并使用虚拟等效机组的概念,讨论了考虑主结线运行方式约束的厂内经济运行的动态规划算法.
Based on the analysis of various mathematical models for the economic operation of hydropower plants in the plant, the influence of the constraints of the main junction line on the economic operation was considered. The concept of virtual equivalent units was used to discuss the plant Dynamic Planning Algorithm for Economic Operation.