6年来,马钢焦化厂坚持利用余热余气发电4832.9万千瓦时,取得了明显的节能效果。马钢焦化厂是个耗能大户,为了降耗节能,该厂根据自备锅炉向用户供气时需要节流的情况,在热力管网中安装了两台B1.5~35/13背压发电机组,利用余热余气发电。该工程被列为马钢节能重点工程之一。1983年4月15日第一台机组建成并发电,6年来一直运行正常,
In the past 6 years, Masteel Coking Plant has maintained a total energy consumption of 48.329 million kwh with waste heat and residual gas and achieved remarkable energy-saving results. Masteel Coking Plant is a large energy consumer, in order to reduce energy consumption, the plant according to their own boiler to the user when the need to throttle the situation, in the heat pipe network installed two B1.5 ~ 35/13 back pressure power generation Unit, the use of surplus heat gas power generation. The project is listed as one of Masteel key projects. April 15, 1983 the first unit built and power generation, 6 years has been operating normally,