论文部分内容阅读
淮安第二抽水站位于江苏省淮安县城西南方约三公里处,是南水北调工程的第二个梯级泵站,是我国目前已投入运行的泵站中最大的一个泵站,它共装机两台水泵——电动机组,水泵直径为4.5米的、叶片可调的大型轴流泵,配套同步电机容量为5000KW,水泵单机流量为50立米/秒。淮安第二抽水站於79年初主机经试运转后正式投入运行。但是,由我院黄宝南和原我
Huaian Second Pumping Station is located in Huai’an County, Jiangsu Province, about three kilometers southwest of the South Water Diversion Project is the second cascade pumping station, is currently China’s largest pumping station has been put into operation, it installed a total of two pumps - Motor set, pump diameter of 4.5 meters, the blade adjustable large axial flow pump, matching synchronous motor capacity of 5000KW, single pump flow 50 cubic meters / second. Huaian second pumping station in early 79 after the main engine test run officially put into operation. However, by our hospital Huang Baoan and former me