石瓦房水库始建于七十年代,工程未进行前期勘察工作,在无地质设计资料、地质情况不明的情况下建设;又因国家投入资金不足,技术力量缺乏,造成工程设计标准偏低,对存在的工程地质和水文地质缺陷未进行处理;后虽经过两次加固治理,但未能彻底根除,病险情况日益严重。本文针对该水库的具体工程地质、水文地质条件,提出了相应的处理方案,对类似工程有一定借鉴作用。
Shifangfang Reservoir was built in the seventies, the project did not conduct preliminary surveys, in the absence of geological design information, geological conditions unknown circumstances; due to lack of state funding, lack of technical strength, resulting in low engineering design standards, The existing engineering geology and hydrogeological defects have not been dealt with. After two times of reinforcement and treatment, they have not been completely eradicated and the disease situation is worsening. In this paper, according to the specific engineering geology and hydrogeological conditions of the reservoir, the corresponding treatment scheme is put forward, which can be used as reference for similar projects.