97年11月24日~12月15日,河南黄河河务局科技处组织由小浪底工程咨询公司、河南省交通厅设计院、黄委会设计院、河南河务局等4个单位的7位专家,对河南黄河工程局一完成的科技成果项目《小浪底水利枢纽工程4~#公路水泥结碎石路面施工技术》、《特重型公路大桥 T 梁施工工艺》进行了函审评审。这两项科技成果均为小浪底水利枢纽工程中的项目,通过评审,专家一致认为,T 梁施工工艺的加工流程设计达到国内先进水平,为我
From November 24, 1997 to December 15, 1997, the Science and Technology Department of Henan Yellow River River Bureau organized 7 experts from Xiaolangdi Engineering Consulting Company, Design Institute of Henan Communications Department, Design Institute of Yellow River Committee and Henan River Bureau, Experts conducted a letter review of the completion of scientific and technological achievements project of Henan Yellow River Engineering Bureau, “Xiaolangdi Water Control Project 4 ~ # Highway Cement Crushed Stone Pavement Construction Technology”, “T heavy beam highway Bridge Construction Technology”. Both of these scientific and technological achievements are projects in Xiaolangdi Hydro-junction Project. Through the review and appraisal, experts agree that the design of the processing flow of the T-beam construction technology has reached the advanced level in China,