论文部分内容阅读
已往在工程地质钻探中,每班钻工由5—6人,减至每班4人,整风开始以后,武汉水电设计院为了节省人力,合理调整劳动组织,试行三人一班制,结果良好,mr 同志们又大胆提出,三人一班时在正常钻进时有一人开着,故自动要求试行两人一班制。这个倡议很快的在303及302两队推广,执行以来三月份在资水经过现场会议的鉴定,及四月份郴县地委所组织的郴县各地勘队在耒水的观摩,认为工程地质及地质普查的钻探中,可以推广,因为钻孔都比较浅,一般在
In the past, in engineering geological drilling, the number of drillers dropped from 5-6 in each class to 4 in each class. After rectification, Wuhan Hydropower Design Institute tried its best to save labor, reasonably adjust the labor organization, Comrades, mr, boldly suggested that when one of the three men and one man were driving normally, one of them would be driving. Therefore, a trial of two people in a class was automatically required. This initiative was quickly promoted by the two teams 303 and 302 in March since the implementation of the identification of water conservancy and water conservancy projects through the on-site meeting in March and the Chen County Prefectural Party Committee in April organized by the various teams in Chenxian watching the water, that the engineering geology And geological census drilling, you can promote, because the drilling is relatively shallow, generally in