论文部分内容阅读
分析了黄河内蒙古段“6.26”水污染事件发生原因,提出加强污染源头治理、正确设置排污口、乌梁素海退水应选择适当时机、水利环保联合治污等综合防治对策。
The causes of “6.26” water pollution in Inner Mongolia section of the Yellow River were analyzed. The countermeasures were put forward such as strengthening the control of pollution sources, setting the outlet correctly, returning the Wuliangsuhai Sea to the proper time, and jointly controlling water and environmental pollution.