论文部分内容阅读
制钉水坠坝土料试验《规程》讨论会和陕晋两省水坠坝试验研究工作组领导小组扩大会议于一九七七年三月下旬在广州联合召开。 参加两省水坠坝试验研究扩大会议的除工作组有关协作单位的代表外,还邀请了广东省水电局、水科所、水电设计院、广州市水电局、广东省德庆、信宜水电局、广西梧州地区水电局、广西苍梧水电局、西北农学院水利系、广东工学院等单位的代表参加,水电部科技司、水电部黄河水利委员会也派员到会指导。会议主要审查了《水坠坝设计要点》和安排落实了一九七七年试验研究任务。 下面摘要转载制订水坠坝土料试验《规程》讨论会情况简报。
Nail water falling into the dam soil test “rules” seminar and Shanxi and Shanxi provinces water drop dam experimental study group leading group to expand the meeting in late March 1977 held in Guangzhou. Participate in the two provinces water drop dam experimental study to expand the meeting in addition to the Working Group on behalf of collaborating units, but also invited the Guangdong Provincial Bureau of Hydropower, Water Institute, Hydropower Design Institute, Guangzhou Municipal Hydropower Bureau, Guangdong Deqing, Xinyi Hydropower Bureau of Guangxi Wuzhou Hydropower Bureau, Guangxi Cangwu Hydropower Bureau, Northwest Agricultural College Water Resources Department, Guangdong Institute of Technology and other units to participate in the Ministry of Science and Technology Ministry of MEP, the Yellow River Water Resources Commission of the Ministry of MEP also sent to the guidance. The meeting mainly reviewed the “Design Points of Water Falling Dams” and arranged for the implementation of the task of experimental research in 1977. The following summary reproduced to develop water fall dam soil test “rules” seminar briefings.