论文部分内容阅读
水电站混凝土面板堆石坝的施工存在很多难点,这需要及时的总结,以某水电站的混凝土面板堆石坝施工为例,在这方面进行探索。
There are many difficulties in the construction of the concrete faced rockfill dam of the hydropower station, which needs to be summarized in time. Taking the concrete faced rockfill dam construction of a hydropower station as an example, exploration is made in this respect.