葛洲坝工程规模巨大,主要建筑物结构复杂,地质上也存在一些缺陷。施工和运行过程中,在坝基缺陷处理、减压排水孔的反滤、混凝土浇筑、坝体混凝土裂缝处理、接缝止水、高流速区混凝土的修补、金属表面保护等方面都使用了化学材料品种多达60多种,总用量4 800多t,不仅解决了工程建设和运行中的问题,还节约了投资,也为其他工程积累了经验。本文对葛洲坝工程应用化学材料作了全面介绍。随着科学技术的进步,化学工业的发展,化学材料在水电工程中的应用必将日益增多。
Gezhouba project is huge scale, the main structure of complex buildings, there are also some geological defects. During the process of construction and operation, chemical materials were used in the treatment of defects in the dam base, filtration of decompression drainage holes, concrete pouring, concrete crack treatment in the dam, water sealing in the joints, concrete repairing in high flow velocity areas and metal surface protection As many as 60 kinds of varieties, the total amount of more than 4,800 t, not only solved the construction and operation of the problem, but also saves investment, but also accumulated experience for other projects. This article made a comprehensive introduction to the Gezhouba engineering application of chemical materials. With the progress of science and technology, the development of chemical industry, the application of chemical materials in hydropower projects will surely increase day by day.