论文部分内容阅读
一、工程概况上棉31厂新建综合车间为钢管混凝土结构,平面尺寸32.5×16(米),总高12.16米,共三层,建筑面积1524平方米,柱网尺寸4×8(米),层高依次为4.5米、3.9米和3.6米。预制梁、板,现浇楼梯。共24根钢管柱,钢管由钢板焊接,再卷成圆管,外径为369毫米,壁厚7毫米,长13.41米。图1为综合车间外景。二、施工准备用宽65毫米,厚5毫米的扁钢,按钢管外径尺寸做成二个半圆环,将B-11A型附着式混凝土振动器,抱在钢管身上(半圆环和钢管外皮之间留3~5毫米空隙)。在上层楼板缝中,固定一个定滑轮,用棉纱绳吊住振
I. Project Overview Shangmian 31 Factory is a new steel-concrete structure with a plane size of 32.5×16 (meters) and a total height of 12.16 meters. It has a total of three floors, a building area of 1,524 square meters, and a column grid size of 4×8 (meters). The floor height is 4.5 meters, 3.9 meters and 3.6 meters in order. Prefabricated beams, slabs, cast-in-place staircases. A total of 24 steel tube columns were welded by steel plates and then rolled into round tubes with an outer diameter of 369 mm, a wall thickness of 7 mm and a length of 13.41 meters. Figure 1 shows the integrated workshop location. Second, the construction preparation with a width of 65 mm, 5 mm thick flat steel, according to the outer diameter of the steel pipe to make two and a half rings, the B-11A attached concrete vibrator, hold the steel body (half ring and steel pipe Leave a 3 to 5 mm gap between the skins). In the upper floor slab seam, fix a fixed pulley and use a cotton rope to suspend the vibration