截止1978年,霍姆斯特克金矿一直采用传统的上向梯段水平分层充填法、留矿法、方框支柱法。但是,高成本、低效率、安全性差的现实,迫使该矿寻求一种“大量开采”技术,作为矿山的主要采矿方法.深孔矿一直很有成效,但其采准工作量非常大,采准时间满足不了产量增长的要求,因此选择了 VCR 法.目前该矿用此法生产的矿石量,占总产量的50%以上。VCR 法的应用历史,成败得失在矿内有了讨论.
As of 1978, the Homestake gold mine has been using the traditional up-to-ladder level filling method, leaving the mining method, box pillar method. However, the reality of high costs, inefficiencies and poor safety has forced the mine to seek “mass production” technology as the primary mining method for mining operations. Deep-hole mines have been very successful but their workload is very high. Quasi-time can not meet the requirements of production growth, so choose the VCR method. At present, the ore ore produced by this method, accounting for more than 50% of the total output. VCR law application history, success or failure in the mine have been discussed.