论文部分内容阅读
针对润扬大桥北锚碇基础的特殊性 ,对地连墙施工的关键工序和难点问题进行了工艺性试验研究。
Aiming at the peculiarity of north anchorage foundation of Runyang Bridge, the technological experiment on the key procedures and difficult points of the construction of the ground-connected wall is carried out.