论文部分内容阅读
介绍乌鞘岭特长隧道出口段的整体施工方法 ,重点论述了出口正洞工区设备配套原则及方案 ,以及快速施工取得的效果
This paper introduces the overall construction method of Wushaoling super long tunnel exit section, mainly discusses the equipment supporting principle and scheme of exit main tunnel work area and the effect of rapid construction