为积极响应国家节能减排、淘汰落后产能政策,雅矿公司哈密球团合金厂2台6300KVA矿热炉相继于2013年6月25日和8月25日停产,现正在拆除。雅矿公司2台6300kVA矿热炉分别建成于2000年和2004年,设备状况差,生产工艺落后,年生产能力为1万吨硅铁合金。根据《国务院关于进一步加强淘汰落后产能工作的通知》和《关于印发〈新疆工业和信息化领域承接产业转移指导目录(2011年本)〉(试行)的通知》的文件
In order to actively respond to the national energy-saving emission reduction and elimination of outdated production capacity, two 6,300KVA submerged arc furnaces of the Yaomi Company’s Hami pellet alloy plant were discontinued one after another on June 25 and August 25, 2013 and are being demolished. Two 6300kVA ore furnaces of Ya Mine Company were built in 2000 and 2004, respectively, with poor equipment status and backward production technology. The annual production capacity is 10,000 tons of ferrosilicon alloy. According to the “Circular of the State Council on Further Strengthening the Elimination of Obsolete Production Capacity” and the “Notice on Printing and Distributing (Guidance for Industry Guidance in Carrying Out Industrial Transfer in Xinjiang in the Field of Industries (2011)”)