论文部分内容阅读
某玻璃厂前身是县办化肥厂,后改建为玻璃厂,厂区内残存有煤气柜一座,需要拆除,经勘察,决定采用爆破方法进行拆除。1工程概况.煤气柜位干厂区东侧,西距主厂房40m,南距泵房40m,东距仓库20m,北距工人休息室30m,气柜西北及西南有一根电线杆,爆破条件较好,只是泄水条件
The predecessor of a glass factory was the county-level chemical fertilizer plant, which was later converted into a glass factory. There was one gas cabinet left in the factory and it needed to be dismantled. After investigation, it was decided to use the blasting method for demolition. 1 Project Overview. The gas tank is located on the east side of the dry plant area, 40m from the main plant building in the west, 40m from the pump room in the south, 20m from the warehouse in the east, 30m from the workers’ lounge in the north, and there is a telephone pole in the northwest and southwest of the gas cabinet. The blasting conditions are good, only the water is discharged. condition