论文部分内容阅读
本文简要介绍了南阳市白桐灌区渠首枢纽工程根据地形条件、主体工程布置特点及施工总进度安排进行施工导流方案的设计,并根据各方案的经济技术比较,得出最优方案。
This article briefly introduces the design of the construction diversion scheme based on topographical conditions, the main project layout characteristics and construction schedule in the Baitong Irrigation District Headwork Project in Nanyang City. According to the economic and technological comparison of each program, the optimal scheme is obtained.