论文部分内容阅读
前言根据水轮泵(78)阅科研水字第067号文的科研规划,结合我们的具体情况,开展了规划第一个课题——潮汐水轮泵站水轮机水力模型的研究。到目前为止,水轮机、水泵双向工作的水力模型试验台的建设已基本完成。工作水头为0.5米—5米的竖井贯流式水轮机的水力模型试验的第一阶段亦基本完成。
Preface According to the scientific research plan of Water Turbine Pump (78) Read Scientific Water Zi No. 067 and the specific situation of our company, the first project of planning - research on hydraulic model of hydro turbine at Tidal Water Turbine Pumping Station was carried out. Up to now, the hydraulic model test-bed construction of hydraulic turbine and water pump has been basically completed. The first stage of the hydraulic model test of a vertical tubular turbine with working head of 0.5m-5m is basically completed.