建筑幕墙自1983年在联谊大厦应用至今,上海已建幕墙工程逾1000个,在对其中414个工程进行现场检查和调研的结果表明,约有一半的工程存在各种质量问题。因此,为保证建筑物的幕墙质量,上海市建委于1998年下达了“建筑幕墙物理性能检测的暂行规定”,要求所有建筑工程的幕墙,在使用前进行空气渗漏、雨水渗漏和风压变形等性能检测,以发现和解决幕墙在设计、施工、材料等方面所存在的问题。本文就当前幕墙工程中存在的主要问题,产生这些问题的主要原因,以及解决问题的相应措施介绍如下:
Since the construction of the curtain wall in the Lian Yi Building since 1983, more than 1,000 curtain walls have been constructed in Shanghai. The site inspection and investigation of 414 of these projects shows that about half of the projects have various quality problems. Therefore, in order to ensure the curtain wall quality of buildings, the Shanghai Construction Committee issued the Interim Provisions on Testing Physical Performance of Curtain Walls in 1998 and required all curtain walls of construction works to carry out air leakage, rainwater leakage and wind pressure deformation before use Such as performance testing to detect and solve the curtain wall in the design, construction, materials and other aspects of the existing problems. In this paper, the main problems existing in the current curtain wall project, the main reason for these problems, and the corresponding measures to solve the problems are described below: