在柯敏节龙工厂的镀锡镀锌车间里有两个镀1000—2000、0.9—1.5毫米和710—1420、0.9—1毫米薄板用的镀锌槽。每一个槽上各安有一台两导槽式镀锌机,钢板成两排经过槽子。以前,从镀锌机最后一对辊子出来的钢板是用人工把它送到倾斜式运输机上。此工序的操作每班要占用俩人,共占18人(代班人员在内)。工厂的合理化建议者M.T.科姆斯和Б.A.格林科建议在倾斜式运输机2(图)上,距离输出辊1800毫米的地方安一对受料辊1 (图)。由镀锌机出来的钢板被导向装置3弯曲,钢板的端头就被受料辊
There are two galvanized baths in the tin-plated galvanizing plant at the Köln Gulong factory for plates of 1000-2000, 0.9-1.5 mm and 710-1420, 0.9-1 mm. There is a two-channel galvanometer on each tank, and the steel plate goes through the tank in two rows. Previously, the steel plate from the last pair of galvanizing machines was manually fed to a tilting conveyor. The operation of this process to occupy two classes per class, a total of 18 people (on behalf of the class staff included). Mill rationalization advisers M.T. Koms and B.A. Greenenko proposed to place a pair of take-up rollers 1 (Fig.) On the inclined conveyor 2 (Fig.) 1800 mm from the output roller. The steel plate coming out of the galvanizing machine is bent by the guide 3 and the end of the steel plate is taken up by the take-up roller