论文部分内容阅读
本文介绍了在井巷工程总体施工优化方案确定之后,用图算法进行具体安排的优化方法.
This paper introduces the optimization method of concrete arrangement with graph algorithm after the optimization of the overall construction of well and laneway project is confirmed.