主要介绍了上海地铁明珠线蓝村路站-浦东南路站区间隧道联络通道、泵站采用水平冻结加固情况下,隧道支护及结构施工过程,分析了隧道内矿山法施工旁通道对地表及隧道结构产生的影响及解决措施,指出了矿山法施工技术在市政及地铁工程施工中的技术可行性。
This paper mainly introduces the tunnel connection and the construction process of the tunnel between the Blue Cun Road Station of Shanghai Metro Pearl Line and Pudong South Road Station and the pumping station with horizontal freezing reinforcement. The influence of the structure and the solution, and points out the technical feasibility of mine construction method in the construction of municipal and metro project.