公伯峡水电站位于青海省循化县与化隆县交界处的黄河干流上,上距李家峡水电站76km。电站坝址位于西宁以南偏东方向的公伯峡峡口处,距西宁市公路里程153km。公伯峡水电站以发电为主,兼有防洪、灌溉、供水等综合功能,水电站装有5台300兆瓦机组,总装机容量1500MW,多年平均发电量51.4kW·h。公伯峡水电站属一等大(Ⅰ)型工程,其枢纽建筑物由大坝、引水发电系统及泄水建筑物三部分
Gongboxia Hydropower Station is located on the mainstream of the Yellow River at the junction of Xunhua County and Hualong County in Qinghai Province, and is 76km away from Lijiaxia Hydropower Station. The dam site of the power station is located at the Gongboxia Gap at the east of Xining and 153km away from the Xining highway. The Gongboxia Hydropower Station is mainly power generation with integrated functions of flood control, irrigation and water supply. The hydropower station is equipped with 5 300 MW units with a total installed capacity of 1,500 MW and a multi-year average generating capacity of 51.4 kW · h. Gongboxia Hydropower Station is a large (Ⅰ) -type project, the hub of the dam by the dam, water diversion and power generation systems and three parts of the building