一九五一年黄河水利事业计划,系根据已定的治黄方针与五○年全国水利会议的决定来编订的。黄河在最近几年以内,因根除水患的条件尚不具备,仍以防洪为主,应加强护岸及堤防工事:并为根除水患创造条件,应勘测准备潼关、孟津间水库工程,支流修建拦洪拦沙水库,干支流域的水土保持工作,结合农林计划,积极进行。五一年仍以修防为重点工作,并进行中游水库之勘测、钻探与准备上作,继续进行水土保持工作,重点试办山溪沟壑治理,继续推进引黄灌溉济卫工程,积极准备上游宁绥灌溉工程,适当加强电讯、交通设备。兹
The plan of the Yellow River Conservancy in 1951 was compiled in accordance with the guidelines on the government of the Yellow River that have been formulated and the decision of the 50th National Water Conservancy Conference. The Yellow River in recent years, due to the eradication of flooding conditions are not yet available, flood control is still the main priority should be to strengthen the bank and embankment fortifications: and to create conditions for the eradication of floods, should investigate and prepare the Tongguan, Mengjin reservoir project, tributary construction of flood control Water and soil conservation work in the Yingsha reservoir and dry-branch watershed should be actively carried out in accordance with the plan of agriculture and forestry. In 2011, the project will continue to focus on repairing and repairing, and carry out surveying, drilling and preparation of reservoirs in the middle reaches of the Yangtze River. It will continue its efforts in soil and water conservation and will focus on piloting the management of mountain and river gullys. It will continue to promote the construction of the Yellow River Diversion Project, Ning Sui irrigation project, appropriate to strengthen telecommunications, transport equipment. Hereby