论文部分内容阅读
对我国生产的125MW和2000MW机组锅炉本体存在的问题进行了较详细的分析。介绍了几台典型炉子及局部改造状况,提出了综合改造的设想和方向。
The problems existing in the boiler body of 125MW and 2000MW units produced in our country are analyzed in detail. Introduced several typical stoves and the partial reconstruction situation, proposed the plan and the direction of the comprehensive transformation.