水电建设体制改革10多年来,水电工程利用外资的项目越来越多,在造价管理上也进行了一些有益的探索,积累了很多经验,但现行概算编制阶段划分及编制程序已不适应水电建设体制改革的需要。笔者就利用外资水电工程可行性研究阶段概算编制阶段的划分提出一些看法与同志们探讨。自电力工业部电计[1993]567号《关于调
Over the past 10 years, more and more projects have been undertaken to utilize foreign investment in hydropower projects. Some useful explorations have been made in cost management and a great deal of experience has been accumulated. However, the current stage of preparation and preparation of budget estimates is no longer suitable for hydropower construction System reform needs. I will use the foreign hydropower project feasibility study stage budget preparation stages of the division put forward some views and comrades to explore. Since the Ministry of Electric Power Industry [1993] No. 567 "on the tune