1提前介入的必要性维护人员在对光缆线路日常维护和故障定位时常常发现施工单位在光缆建设工程竣工验收时提供的重要项目资料不是缺失,就是与实际线路不符,特别是有些隐蔽工程的资料的缺失和不准确是施工单位后期无法补救的,使光缆线路维护工作陷入被动局面。因此,维护人员应提前介入光缆工程施工和验收,最大限度地保证维护资料的准确性和全面性,以利于光缆线路日常维护和故障定位顺利开展。
The necessity of early intervention In the routine maintenance and fault location of fiber optic cable maintenance personnel often found that the construction unit in the optical cable construction project completion and acceptance of important project information provided is not missing or is inconsistent with the actual line, in particular, some hidden project data The lack and inaccuracy of the construction unit can not be remedied later, so that the optical cable line maintenance work into a passive situation. Therefore, maintenance personnel should intervene in the construction and acceptance of optical fiber cables in advance to ensure the accuracy and comprehensiveness of the maintenance data to the maximum extent so as to facilitate the smooth maintenance and fault location of the optical cable lines.