论文部分内容阅读
文章从工程实际出发,结合已建工程和类似文献中的喉道底断面高程的确定,对现行《水电站引水渠道及前池设计规范》中的问题进行了探讨。
Based on the engineering practice, this paper discusses the problems in the existing “Design Guideline for Water Diversion Channel and Forewatch of Hydropower Station” based on the determination of the throat bottom section elevation in the built projects and similar documents.