谭靖夷院士的讲话

来源 :水利水电施工 | 被引量 : 0次 | 上传用户:cph2009
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
能够参加这次会议,非常高兴。在坐的都是来自第一线的水电工程建设者。近20年来,我国水电发展是非常快的,到2002年底,我国水电装机容量(包括抽水蓄能电站)已超过了8000万KW。到2020年,全国的水电装机容量要达到1亿5千万kW,按现在这个进度可能会超过。目前,我们在建全世界最大的三峡工程,第一批机组将于2003年发电,现在工程进展比较顺利。除三峡工程以外,在建的较大工程就是云南的澜沧江小湾水电站,坝高292m,是国内最高的双曲拱坝,也是目前世界上最高的拱坝,其装机容量达420万kW。另外还有广西的龙滩水电站,其最终坝高216.5m。再就是面板堆石坝,我们国内目前最高的天生桥面板堆石坝坝高178m;在建成的水布垭工程230m,这也是全世界最高的面板堆石坝。在建的都是一些规模比较大、坝较高、装机容量大的电站。准备要建的还有象金沙江的溪洛渡、黄河上的拉西瓦等。水电开发技术的难度也越来越大,如小湾水电站,地形条件虽可建高拱坝,但相当复杂,难度很大,有很高的技术要求;而且坝址在地震区,在某些方面可能比三峡难度还大,很多专业性的问题仍在不断的研究中。龙滩的高碾压砼重力坝地处夏季较长、气温较高,影响了碾压砼的施工,甚至工期延长。夏季施工 I am very happy to be able to attend this meeting. In the sit are from the forefront of hydropower construction builders. In the recent 20 years, the development of hydropower in our country has been very fast. By the end of 2002, hydropower installed capacity (including pumped storage power stations) in China has exceeded 80 million KW. By 2020, hydropower installed capacity in the country will have to reach 150 GW, which is likely to exceed that now. At present, we are constructing the largest Three Gorges project in the world. The first batch of generating units will generate electricity in 2003 and the project is now proceeding smoothly. In addition to the Three Gorges Project, the larger project currently under construction is the Lancang River Xiaowan Hydropower Station in Yunnan Province, with a dam height of 292m. It is the highest double curvature arch dam in China and the tallest dam in the world with an installed capacity of 4.2 million kW. In addition there are Longtan Hydropower Station in Guangxi, the final height of 216.5m. Then there is the face rockfill dam, our present highest Tianshengqiao deck rockfill dam height of 178m; Shuibuya completed in the project 230m, which is the highest in the world panel rockfill dam. Under construction are some larger, higher dam, installed capacity of large power plants. There are also plans to build Xiluodu such as the Jinsha River, Laxiwa on the Yellow River and so on. Hydropower development technology is also more and more difficult, such as the Xiaowan Hydropower Station, although the arch top conditions can be built, but quite complex, very difficult, with high technical requirements; and the dam site in the earthquake, in some It may be more difficult than the Three Gorges area, many professional issues are still ongoing research. Longtan high RCC gravity dam is located in the summer is longer, the temperature is higher, affecting the construction of RCC, or even extended duration. Summer construction
其他文献
先天性高铁血红蛋白血症,为少见病,国内仅陆续有少数病例报告。本病的主要症状是:早期发绀,在出生后或生后数年即出现紫绀,一旦出现即不再消失,无杵状指及心肺疾病。应用药
各市、州、县人民政府,省政府各厅委、各直属机构:省人民政府同意将湘西龙山里耶古城遗址列为省级文物保护单位。同意省文物局划定的该遗址的保护范围、建设控制地带(保护范
近年来,胆硷能神经阻滞剂山茛菪硷(化学合成品称654—2)广泛用于临床,现将其主要用途加以介绍.一、胃、肠、胆绞痛:654—2对痉挛的胃、肠、胆道平滑肌有明显的松弛作用.经临
我院1973~1979年共收治38例急性氯喹中毒患者,现报告如下。临床资料性别与年龄:男性14例,女性24例。最小17岁,最大54岁。中毒剂量:最少6片,最多20片(每片含基质0.15克)。均一
作者报告了三例减压病病例,这三例主要用高压氧气闸进行了治疗。第1个病例是31岁的研究所职员(男),在水深45米下作业3次,每次15分钟,在作业终了后20分钟发病。次日早 The a
1976年12月,我院抢救某氮肥厂液氨贮槽意外爆裂事故中所致急性氨中毒病人34例。其中男26例,女8例;最小年龄1岁,最大年龄33岁;工人30例,家属3例,小儿1例。临床表现本组病例均
卵巢发育不全征的病因不外乎遺传因素和环境因素。遺传性卵巢发育不全最常见的为Turoer氏綜合征,其特征是患者性染色体只有一条,核型为45,XO,而正常女子的性染色体則为两条,
我部于1978年6月11日对万米赛跑中17名中暑病人进行了抢救,效果较好,2~6小时内全部步行返回单位。初步总结报告如下。一、一般情况及表现 17例中暑运动员全部为我校学工人员,
根据中共中央、国务院批准的《北京市党政机构改革方案》和《北京市人民政府关于机构设置的通知》(京政发[2000]2号),北京市旅游事业管理局更名为北京市旅游局(简称市旅游局
自1956年4月至1977年4月,我院共收容流行性脑脊髓膜炎(简称流脑)1,112例,死亡19例,病死率1.7%.为吸取教训,本文就死亡19例小结讨论于后.一般资料(一)诊断依据1.起病急、高烧